Foam Injection Warranties and Long-Term Performance
A foam injection project begins with a sub-base survey. Scaldino Basement Solutions uses a steel probe rod to confirm void locations and estimate their depth and lateral extent beneath the slab. Injection port locations are marked at measured intervals, typically every 18 to 24 inches in a grid pattern across the settled area, with additional ports near the perimeter where voids most commonly originate.

