Mon - Friday 8am - 9pm | Sat 9am - 5pm
(908) 895-6016
info@scaldinobasement.com

Does a basement digout require waterproofing?

Yes. Waterproofing is not optional on a basement digout project. When you excavate below the existing floor level, you expose the lowest point of the structure to direct soil contact and groundwater. A new concrete floor slab poured without a drainage system and vapor barrier will develop moisture problems, often within the first year.

Scaldino Basement Solutions installs an interior drainage system along the perimeter of the new floor before the slab is poured, directing any water that enters through the walls to a sump basin and pump. A continuous plastic vapor barrier is also installed under the slab to block moisture vapor from migrating up through the concrete.

Waterproofing the new space is included in the project scope rather than treated as an add-on. This approach protects your investment, meets NJ code requirements for habitable below-grade space, and prevents the mold and moisture problems that make unprotected basements unusable.

Contact Scaldino Basement Solutions to schedule a free assessment and receive a complete project scope.

Scaldino Basement Solutions proudly serves New Jersey and Staten Island families with expert waterproofing, foundation repair, and crawl space solutions. For over 20 years, we've transformed wet basements into safe, healthy living spaces. Your family's safety is our priority.

License Number

Traditional Installment Loan

*Credit and loans provided by Regions Bank, Member FDIC, (650 S. Main St., Suite 1000, Salt Lake City, UT 84101) on approved credit, for a limited time. 8.99% to 24.49% fixed APR (provided however, APR will not exceed 15.99% for residents of New Jersey and 17.99% for residents of Florida and Wisconsin), subject to change. Minimum loan amounts apply. Interest starts accruing when funds are disbursed. Open line period payments due 90 days after origination and monthly thereafter during open line period. When open line period ends, the balance becomes a fixed rate installment loan; repayment terms vary from 12 to 144 months. Actual loan term may be shorter if less than the full approved amount of credit is used. First monthly loan payment due 30 days from the end of the open line period. Monthly payments vary from $11.49 to $30.27 per $1,000 borrowed depending on term and interest rate. The minimum monthly payment will be no less than $50.00.

Waterproofing

Concrete Leveling

© Copyright Scaldino Basement Solutions