Mon - Friday 8am - 9pm | Sat 9am - 5pm
(908) 895-6016
info@scaldinobasement.com

Do I need a permit for underpinning in NJ?

Yes, a building permit is required for basement underpinning in every New Jersey municipality. Underpinning changes the load-bearing capacity and depth of your foundation, which falls under the NJ Uniform Construction Code and requires review by your local construction official before work can begin.

In addition to the building permit, your permit application must include stamped structural engineering drawings prepared by a licensed Professional Engineer registered in New Jersey. These drawings specify the staged excavation sequence, footing dimensions, concrete mix specifications, and required inspections at each stage.

Scaldino Basement Solutions manages the entire permit process on your behalf, from preparing the application package to coordinating inspections with your municipality. Working without a permit creates significant liability at resale and can result in costly stop-work orders. Contact Scaldino Basement Solutions to start your free assessment and permit review.

Scaldino Basement Solutions proudly serves New Jersey and Staten Island families with expert waterproofing, foundation repair, and crawl space solutions. For over 20 years, we've transformed wet basements into safe, healthy living spaces. Your family's safety is our priority.

License Number

Traditional Installment Loan

*Credit and loans provided by Regions Bank, Member FDIC, (650 S. Main St., Suite 1000, Salt Lake City, UT 84101) on approved credit, for a limited time. 8.99% to 24.49% fixed APR (provided however, APR will not exceed 15.99% for residents of New Jersey and 17.99% for residents of Florida and Wisconsin), subject to change. Minimum loan amounts apply. Interest starts accruing when funds are disbursed. Open line period payments due 90 days after origination and monthly thereafter during open line period. When open line period ends, the balance becomes a fixed rate installment loan; repayment terms vary from 12 to 144 months. Actual loan term may be shorter if less than the full approved amount of credit is used. First monthly loan payment due 30 days from the end of the open line period. Monthly payments vary from $11.49 to $30.27 per $1,000 borrowed depending on term and interest rate. The minimum monthly payment will be no less than $50.00.

Waterproofing

Concrete Leveling

© Copyright Scaldino Basement Solutions