Mon - Friday 8am - 9pm | Sat 9am - 5pm
(908) 895-6016
info@scaldinobasement.com

How long does a typical carbon fiber installation take from start to finish?

A standard single-wall carbon fiber installation on an eight-foot basement wall requiring six to eight straps is typically completed within one working day. That scope includes surface grinding, epoxy application, strap placement, and anchor set. Full-perimeter installations on larger homes generally require two to three working days.

The structural epoxy requires an additional twenty-four to seventy-two hours to cure before the wall can be backfilled, finished, or furred out. We do not accelerate cure schedules in cold New Jersey basements because bond strength is temperature-dependent.

Scaldino Basement Solutions performs this work throughout New Jersey. Contact us for a complimentary on-site assessment.

Scaldino Basement Solutions proudly serves New Jersey and Staten Island families with expert waterproofing, foundation repair, and crawl space solutions. For over 20 years, we've transformed wet basements into safe, healthy living spaces. Your family's safety is our priority.

License Number

© Copyright Scaldino Basement Solutions