Mon - Friday 8am - 9pm | Sat 9am - 5pm
(908) 895-6016
info@scaldinobasement.com

Poor Cellar Door Drainage

Poor drainage around cellar doors is a primary cause of recurring basement water problems in the New Jersey and Staten Island area. Without an adequate drainage path, rainwater and snowmelt collect around the door opening, saturate the surrounding soil, and eventually find their way through seams, the threshold, and frame joints. Homeowners can identify the problem by water marks or erosion around the door, ice buildup in the door well during winter, and basement flooding that consistently follows heavy rain events.

The root cause is almost always insufficient grading or a missing drain system. Water needs a clear path away from the foundation, and when that path does not exist the cellar door area becomes a collection point. Scaldino installs purpose-built drainage systems that intercept surface water before it reaches the door, including channel drains, properly graded concrete aprons, and connection to perimeter drainage where needed. Combined with waterproof membranes along the frame and threshold, a complete drainage solution eliminates the conditions that allow water to accumulate and enter through the cellar door.

Scaldino Basement Solutions proudly serves New Jersey and Staten Island families with expert waterproofing, foundation repair, and crawl space solutions. For over 20 years, we've transformed wet basements into safe, healthy living spaces. Your family's safety is our priority.

License Number

Traditional Installment Loan

*Credit and loans provided by Regions Bank, Member FDIC, (650 S. Main St., Suite 1000, Salt Lake City, UT 84101) on approved credit, for a limited time. 8.99% to 24.49% fixed APR (provided however, APR will not exceed 15.99% for residents of New Jersey and 17.99% for residents of Florida and Wisconsin), subject to change. Minimum loan amounts apply. Interest starts accruing when funds are disbursed. Open line period payments due 90 days after origination and monthly thereafter during open line period. When open line period ends, the balance becomes a fixed rate installment loan; repayment terms vary from 12 to 144 months. Actual loan term may be shorter if less than the full approved amount of credit is used. First monthly loan payment due 30 days from the end of the open line period. Monthly payments vary from $11.49 to $30.27 per $1,000 borrowed depending on term and interest rate. The minimum monthly payment will be no less than $50.00.

Waterproofing

Concrete Leveling

© Copyright Scaldino Basement Solutions