Mon - Friday 8am - 9pm | Sat 9am - 5pm
(908) 895-6016
info@scaldinobasement.com

How long does carbon fiber wall reinforcement take to install?

Most carbon fiber wall reinforcement projects are completed in one day. Our team prepares the wall surface, applies structural epoxy, and bonds the carbon fiber straps at engineered intervals. The epoxy cures within 24 to 48 hours to reach full strength. There is minimal disruption to your home, and the basement can typically be used again the same day.

Scaldino Basement Solutions proudly serves New Jersey and Staten Island families with expert waterproofing, foundation repair, and crawl space solutions. For over 20 years, we've transformed wet basements into safe, healthy living spaces. Your family's safety is our priority.

License Number

Traditional Installment Loan

*Credit and loans provided by Regions Bank, Member FDIC, (650 S. Main St., Suite 1000, Salt Lake City, UT 84101) on approved credit, for a limited time. 8.99% to 24.49% fixed APR (provided however, APR will not exceed 15.99% for residents of New Jersey and 17.99% for residents of Florida and Wisconsin), subject to change. Minimum loan amounts apply. Interest starts accruing when funds are disbursed. Open line period payments due 90 days after origination and monthly thereafter during open line period. When open line period ends, the balance becomes a fixed rate installment loan; repayment terms vary from 12 to 144 months. Actual loan term may be shorter if less than the full approved amount of credit is used. First monthly loan payment due 30 days from the end of the open line period. Monthly payments vary from $11.49 to $30.27 per $1,000 borrowed depending on term and interest rate. The minimum monthly payment will be no less than $50.00.

Waterproofing

Concrete Leveling

© Copyright Scaldino Basement Solutions