How long does a basement digout take?

A full basement digout typically takes four to eight weeks, depending on the size of the home, soil conditions, and the scope of the project. The work includes excavation, foundation wall construction, floor pouring, waterproofing, and final grading. We provide a detailed timeline during our assessment.